44 YEAR OLD GABION STRUCTURE
44 YEAR OLD GABION STRUCTURE
As the cliff was above the normal high tide level, it was  considered sufficient to construct a stepped retaining wall   from massView
star
50 YEAR OLD GABION STRUCTURE – RIVER HUMBER
50 YEAR OLD GABION STRUCTURE – RIVER HUMBER
A ‘half-tide’ gabion wall, 2m high on an 18m wide gabion  apron (0.5m thick). The volume of protection was   approximately 13,View
star
A2 / A282 JUNCTION IMPROVEMENTS
A2 / A282 JUNCTION IMPROVEMENTS
The project team needed a solution that steepened the slope, thereby reducing the land take and saving the hedgerow. The main Contractor on the projecView
star
AINLEY INDUSTRIAL ESTATE DEVELOPMENT
AINLEY INDUSTRIAL ESTATE DEVELOPMENT
Maccaferri provided support to the project team and  proposed the MacWall Landmark segmental reinforced soil   wall system. MView
star
ARTESANO GALLERIA
ARTESANO GALLERIA
The retaining walls were designed using a gravity gabion retaining system. The architectural boundary walls were defined with a maximum thickness of 5View
star
ATI PORT EXPANSION
ATI PORT EXPANSION
In order to address the challenge of improving the port expansion grounds at the Manila South Harbor, Asian Terminals Inc. (ATI) is implementing a cosView
star
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErView
star
AVALANCHE MITIGATION FOR MSP 12 (L) NEAR ROHTANG TUNNEL
AVALANCHE MITIGATION FOR MSP 12 (L) NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErView
star
AZUDES SITIO RAMSAR RÍO DESAGUADERO
AZUDES SITIO RAMSAR RÍO DESAGUADERO
To date, two of the six planned weirs have been constructed. For the construction of the curtain, approach works and the dissipation basin, gabion boxView
star
BAFOKENG CIVIC CENTRE MACWALL
BAFOKENG CIVIC CENTRE MACWALL
In keeping with their tradition of providing innovative, engineered solutions, Maccaferri Africa/African Gabions proposed the use of the MacWall CompaView
star
BALESIN ISLAND CLUB RUNWAY
BALESIN ISLAND CLUB RUNWAY
Considering the challenges, Maccaferri engineers coordinated with the Project Consultant (TCGI Engineers) in coming up with an alternative solution. TView
star
BARRAGEM CAMPEIRA – CRISTALÂNDIA
BARRAGEM CAMPEIRA – CRISTALÂNDIA
After complex hydrological studies, the dam was resized. The width of the spillway was increased to 125 metres and it was lined with PoliMac® gabionsView
star
BELFAST HARBOUR
BELFAST HARBOUR
The works included dregging of the new berth and  approaches. This involved the disposal of 500,000m3 of   material to sea with trView
star
BIFURCATION A10/171 ORLEANS
BIFURCATION A10/171 ORLEANS
The reinforced embankments made by Maccaferri formed the return walls of the C1 and C3 abutments of the PSI986 structure. This viaduct connects the A7View
star
BONHILL, STIRLING ROAD
BONHILL, STIRLING ROAD
Maccaferri was approached by Barratt Homes to come up  with a suitable solution for the posed site problems. It was   agreed that View
star
BORDERS RAIL
BORDERS RAIL
Maccaferri's gabions were used to support widened cuttings  extensively along the 35-mile route which connects   Edinburgh to View
star
BOSCASTLE FLOOD DEFENCES
BOSCASTLE FLOOD DEFENCES
To achieve this solution, Halcrow specified a combination of Reno Mattresses and MacMat-R from Maccaferri. Over 7000 sq metres of Maccaferri wire meshView
star
BROOMLANDS PRIMARY SCHOOL
BROOMLANDS PRIMARY SCHOOL
Once the overall design had been agreed, Maccaferri was engaged to design, supply and install 8 free standing gabion walls which totalled 78.8m in lenView
star
CANTERA ZIORDIA
CANTERA ZIORDIA
To secure the area, two types of actions were carried out: 1. An active solution to prevent the larger blocks from being mobilised. This system consisView
star
CHARLEROI HOSPITAL
CHARLEROI HOSPITAL
The construction company firstly laid the MacDrain W 1051rolls as indicated by Maccaferri´s technicians to create a drainage layer. After the installView
star
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
Existing rubble mound breakwater was planned to be extended towards sea by about 500m using geotextile tubes (MacTube). The purpose was to reduce the View
star
COBHAM SERVICES HGV PARKING AREA EXPANSION
COBHAM SERVICES HGV PARKING AREA EXPANSION
The proposal was to increase the HVG parking numbers by  79 new spaces, to the west of the petrol filling station. The   proposal View
star
COLLEY LANE SOUTHERN ACCESS ROAD
COLLEY LANE SOUTHERN ACCESS ROAD
The ParaLink LTPs will transfer loads of the mechanically  stabilised earth walls into the pile foundations beneath. The maximum heightView
star
DANFOSS FACTORY
DANFOSS FACTORY
Maccaferri were approached by Quattro Consult Limited in  July 2021 to propose a suitable high strength geogrid for use   as a basView
star
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
Maccaferri worked with Wood Patel Engineering to design a hydraulic solution for the microprocessor manufacturer TSMC. To reduce the soil erosion alonView
star
DEBRIS FLOW PROTECTION LERINI STREAM
DEBRIS FLOW PROTECTION LERINI STREAM
After a fierce challenge against the competitor, Maccaferri Balkans won this project thanks to a mix of high performing technical solutions, cost effeView
star
DIDIPIO MINE ACCESS ROAD
DIDIPIO MINE ACCESS ROAD
The solution proposed by Maccaferri, through its recommended contractor, Infratex Philippines Inc. (IPI), was approved by the customer. The slopeView
star
DILMUNIA GRAND CANAL & MARINA (DGCM)
DILMUNIA GRAND CANAL & MARINA (DGCM)
The construction of the Dilmunia canal is the object of an international Tender. The tender design for the waterproofing works has been developed by tView
star
Drainage of structures
Drainage of structures
The adopted solution was the construction of draining trenches using the MacDrain® TD geocomposite as lateral base drains. These drains are designed View
star
EROSION CONTROL AGAINST MAMMAL BURROWING
EROSION CONTROL AGAINST MAMMAL BURROWING
Maccaferri was approached by contractors Crown Services Ltd and asked for advise on a suitable steel wire mesh system that could provide the required View
star
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
Maccaferri has proposed the erosion control system consisting of rolled erosion control products (RECP)-MacMat R (Steel reinforced synthetic geomat) aView
star
EROSION CONTROL MEASURES ON RAILWAY EMBANKMENT, RAJASTHAN
EROSION CONTROL MEASURES ON RAILWAY EMBANKMENT, RAJASTHAN
To prevent the soil erosion on the embankment slopes, Maccaferri offered different solutions based on the slope height to be protected against erosionView
star
EXTENSION OF THE CHANTERAINES PARK
EXTENSION OF THE CHANTERAINES PARK
The Conseil Général 92 chose double-twist gabion cages because they allow the filling materials to show through easily. The infill stone chosen comeView
star
FLOOD EMERGENCY RESPONSE PROJECT
FLOOD EMERGENCY RESPONSE PROJECT
In May 2019, before the flood reached its peak, the city was able to create flood control barriers using FlexMac DT in multiple strategic locations toView
star
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
Maccaferri proposed the use of the MacWall Vertica 4°  Segmental Block Retaining Wall System. The 4° batter of   this system creView
star
FV17 LIAFJELLET-OLVIKVATNET
FV17 LIAFJELLET-OLVIKVATNET
Maccaferri, in cooperation with its local partner PRETEC AS, proposed an optimized solution to the contractor and the investor, aimed at enhancing theView
star
G5513长张高速(益常段)路面大修工程
G5513长张高速(益常段)路面大修工程
基于提高路面结构使用寿命,提升车辆行车环境安全性,降低道路寿命周期维修成本,经过专家论证设计采用路面View
star
Gabion Defense – Cajuca East Corridor
Gabion Defense – Cajuca East Corridor
The Provincial Municipality of Nazca was in charge of the technical file through its technical study department. The hydraulic approach they determineView
star
HASANKEYF ARCHEOPARK PROJECT
HASANKEYF ARCHEOPARK PROJECT
The retaining walls, which will reach a height of 27 meters within the scope of the Hasankeyf archeopark project, has been designed with Terramesh SysView
star
HELBOR BROOKLIN
HELBOR BROOKLIN
The solution for this project involved the demolition of the existing retaining wall and the installation of a vertical drainage system using the MacdView
star
HELLOMAC – Ponza – Cala Fonte
HELLOMAC – Ponza – Cala Fonte
Maccaferri has always pursued innovation and has already taken part in this digital transformation developing a new alert system: HELLOMAC. Thanks to View
star
HELMHOLTZ-ZENTRUM BERLIN ADLERSHOF
HELMHOLTZ-ZENTRUM BERLIN ADLERSHOF
The company Secon Systems GmbH, partner of Maccaferri for the German market, provided full assistance, proposing a solution with the so-called beaver-View
star
HUHUGAM HERITAGE CENTER
HUHUGAM HERITAGE CENTER
The aesthetics of gabions were desirable, yet a traditional gabion retaining structure would be very expensive. Therefore Maccaferri suggested the useView
star
IPO DAM SILT CURTAINS
IPO DAM SILT CURTAINS
To address the degradation of the Ipo Dam and mitigate the adverse effects of soil erosion and water contamination, various long-term solutions are beView
star
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
Byrne Looby and Partners were engaged by main contractor Siac Ltd, to value engineer the originally designed proposals as detailed on the project drawView
star
LANPING LEAD-ZINC MINING SANCHONGSHAN DUMP RETAINING WALL PROJECT
LANPING LEAD-ZINC MINING SANCHONGSHAN DUMP RETAINING WALL PROJECT
According to the geological conditions and engineering requirements of the project, the owner and the design unit comprehensively consider the economyView
star
LINCOLNSHIRE EFW
LINCOLNSHIRE EFW
Consulting engineers, Arup, devised a two stage system of  ground level wet and dry holding lagoons. These were   impermeably lineView
star
LISTENING MIRRORS HISTORIC SITE
LISTENING MIRRORS HISTORIC SITE
In the first phase of the project the peninsula housing the Mirrors was cut off to create an island linked to the mainland by a swing footbridge, and View
star
LÖTZGALERIE
LÖTZGALERIE
The client chose the most economical system. The Maccaferri RB 3000 safety net with an energy of 3000 kJ and a height of 5 m. It was a great challengeView
star
Lower Campbell Repair
Lower Campbell Repair
The erosion control solution consisted of a six to nine-foot-tall, stair-stepped, gabion wall, with a concrete floor base. MaxTex® H 60.1 iView
star
LUOYANG FOUR RIVER TONGZHI PROJECT
LUOYANG FOUR RIVER TONGZHI PROJECT
Maccaferri Gabion + Renomesh solutions improve the overall defense capability of protecting the river bank. Overall consideration of the relationshipView
star
M606 MOTORWAY / M62 JUNCTION
M606 MOTORWAY / M62 JUNCTION
Maccaferri’s double twist woven gabions have been used to  create an approximately 450m, the combined length of road[1]side retaining wallView
star
MacSport AC Monza
MacSport AC Monza
Per il rifacimento del campo di allenamento, sono state coinvolte diverse aziende specializzate nel settore delle infrastrutture sportive, tra cui ItaView
star
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
Constructing a slope protection system along these road sections will promote the road's resiliency and is geared to improve the life and well-beiView
star
MANILA-CAVITE EXPRESSWAY
MANILA-CAVITE EXPRESSWAY
Considering the size of the rock armors (minimum 0.5 meter in diameter), as well as the particle size of sand deposits and the drop height of rocks duView
star
Marginal Protection for the Tonameca River
Marginal Protection for the Tonameca River
Emergency actions such as dredging and the establishment of temporary embankments were implemented. Subsequently, hydrological and topographic studiesView
star
Mass Gravity Retaining Walls
Mass Gravity Retaining Walls
According to the premises outlined in the Environmental Recovery Plan (PRAD) provided by the client, the best solution among the available options in View
star
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
The comprehensive solution involved Maccaferri's expertise and a strategic selection of materials to optimize the environmental remediation procesView
star
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
Maccaferri worked in a JV to implement slope stabilization solutions for landslide zone between Km 504.00 to Km 505.00 on NH-58. It included shifting View
star
MURO DE CONTENÇÃO E ESCADA HIDRÁULICA EM GABIÕES
MURO DE CONTENÇÃO E ESCADA HIDRÁULICA EM GABIÕES
The technical studies carried out indicated that the best solution to the problem presented, among others found on the market, would be two gabion retView
star
MURO DE CONTENCION CARR. ACAYUCAN – LA VENTOSA
MURO DE CONTENCION CARR. ACAYUCAN – LA VENTOSA
The constructor together with the external supervision and the SICT residence analysed different alternatives for the required retaining works, and thView
star
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of products in our portfolio that can achieve thView
star
Natural Hazard Mitigation in the Alps
Natural Hazard Mitigation in the Alps
In the present intervention, rockfall barriers RB 2000 with an interception height of 4.0 m were installed in order to protect the road infrastructureView
star
NEW ASDA STORE
NEW ASDA STORE
The chosen solution was the MacWall Diamond dry build a segmental block retaining wall system due to its rapid speed of construction, flexibility and View
star
NEWHURST ENERGY FROM WASTE FACILITY
NEWHURST ENERGY FROM WASTE FACILITY
Maccaferri proposed the use of its Macline GCL W20 to  impermeably line the attenuation pond and this was   accepted by client HitView
star
NL BERGEN
NL BERGEN
The anti-erosion mat MacMat R020 is reinforced by a polyester geogrid with a tensile strength of 20 kN/m. The MacMat R020 was secured to the slope witView
star
NORTH WALES COASTROAD (A55)
NORTH WALES COASTROAD (A55)
Where the alluvial clay was at its shallowest, after having  removed the refuse, a separator geotextile was placed to   provide a View
star
NTPC SIDING-GADARWARA PROJECT– BLANKET THICKNESS REDUCTION
NTPC SIDING-GADARWARA PROJECT– BLANKET THICKNESS REDUCTION
Use of geosynthetics solution improves the performance of formation layer, which plays an important role for good performance of track. Also, it helpsView
star
Ocean Farm 1 – Supply of KikkoNet Net and Net Structure
Ocean Farm 1 – Supply of KikkoNet Net and Net Structure
As a supplier of the new net pen in this project, Maccaferri is in charge of supplying the KikkoNet containment net and its built-in structural reinfoView
star
OOSTERWEEL VERBINDING -LINKEROEVER, K02B+G01
OOSTERWEEL VERBINDING -LINKEROEVER, K02B+G01
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aView
star
PARAMESH WALL FOR BAJO – MALAWATAR ROAD SEGMENT
PARAMESH WALL FOR BAJO – MALAWATAR ROAD SEGMENT
The Retaining Wall Structure for Bajo – Malawatar Road Segment is constructed using Paramesh System with a height of 8.5m, consisting of a TerrameshView
star
PASSAGEM INFERIOR DA RODOVIA BR-101 EM ESCADA
PASSAGEM INFERIOR DA RODOVIA BR-101 EM ESCADA
A containment and verticalization project for the meeting embankment was implemented using the reinforced soil system with the Terramesh System wall. View
star
PEACE BRIDGE
PEACE BRIDGE
A 40m long,8m high Green Terramesh® reinforced soil abutment wall to surround and support the high-level bridge bank seat and integrate seamlessly wiView
star
Perilago Path – Reconstruction of Route 82
Perilago Path – Reconstruction of Route 82
The most adequate solution for the needs of the work was the reinforced soil. The structure was designed with TerraMesh™ System, the built wall has View
star
PRESA FRANCISCO ABELLÁN
PRESA FRANCISCO ABELLÁN
To protect users and maintenance personnel from possible landslides, a specific solution has been chosen for each situation.To ensure the stability ofView
star
PRESTONS ROAD FLYOVER
PRESTONS ROAD FLYOVER
The avoidance of surcharge on the tunnel and the potential  for differential movement were resolved by supporting the   approach rView
star
PROTEÇÃO COSTEIRA COM GABIÕES
PROTEÇÃO COSTEIRA COM GABIÕES
To protect and control erosion, PoliMac™ box-type gabion containment was used, together with a PoliMac™ Reno® mattress, used at the pipe outlets,View
star
PROTECCIÓN CONTRA CAÍDA DE ROCAS EN ALHABIA
PROTECCIÓN CONTRA CAÍDA DE ROCAS EN ALHABIA
In order to guarantee road safety on the road, emergency work was carried out and awarded to the company Seanto. The work consisted of the following aView
star
PROYECTO TAMBOMAYO
PROYECTO TAMBOMAYO
Se presentó la propuesta de Aditivo Acelerante Libre de Álcalis MacFree AF, un aditivo de última generación que no es nocivo para la salud del traView
star
RAILWAY EMBANKMENT BURROWING PREVENTION
RAILWAY EMBANKMENT BURROWING PREVENTION
Maccaferri’s Anti-Burrowing Mesh has been proven to be a  strong rodent deterrent. Unlike any plastic grids or thin   rabbit netView
star
REDROW HOMES DEVELOPMENT
REDROW HOMES DEVELOPMENT
The excavated chalk was originally scheduled for landscaping and offsite disposal. However, contractor GDL, their designers GES and Maccaferri determiView
star
Rehabilitation due to Undermining in Villalobos
Rehabilitation due to Undermining in Villalobos
An environmentally sustainable engineering solution will be implemented. Technologies such as Terramesh System and Macgrid WG will be used to stabilizView
star
Reinforced Soil Retaining Structure and Slope Reinforcement
Reinforced Soil Retaining Structure and Slope Reinforcement
The client required a solution that met technical, architectural, and environmental requirements, incorporating a green face to transform the retaininView
star
Reinforced Soil Walls and Slope Reinforcement in HUARAZ – ANCASH – Perú
Reinforced Soil Walls and Slope Reinforcement in HUARAZ – ANCASH – Perú
The major challenge was to propose a reinforced soil wall with a considerable height of 19 meters using the technical-economic competitiveness of the View
star
REPAIR AND IMPROVEMENT OF OUELLETTE DRAIN WEST OUTLET
REPAIR AND IMPROVEMENT OF OUELLETTE DRAIN WEST OUTLET
RC Spencer Associates Inc., a reputable engineering firm in  the Windsor area, was tasked by the Town of Amherstburg   to devise aView
star
RESTORATION OF THE ROAD LINK RR 128 AIN OCTOR – KORBOUS
RESTORATION OF THE ROAD LINK RR 128 AIN OCTOR – KORBOUS
The acrobatic works company, Hydrokarst, based in France, solicited Maccaferri to propose solutions for protection against rockfalls. Several types ofView
star
RETAINING WALL SUPPORTING A630
RETAINING WALL SUPPORTING A630
A PVC-coated welded mesh mass gravity gabion wall was  originally proposed within the design. However, the PVC   coating on weldedView
star
RETENTION WORKS FOR YADAGIRI GUTTA TEMPLE AREA
RETENTION WORKS FOR YADAGIRI GUTTA TEMPLE AREA
The site of the presidential suite building area is on hilly terrain and the foundation strata is completely rock. The height of the retention is varyView
star
RINGFIETSPAD ANTWERP
RINGFIETSPAD ANTWERP
Mainly, four different types of facing inclinations have been used for this project: 27°, 34°, 45° and 60° The main product used is Terramesh GreeView
star
Road stabilization in Totonicanapá
Road stabilization in Totonicanapá
The use of mono-oriented MacGrid WG geogrids integrated into the Terramesh system offers a superior technical solution for the containment project in View
star
ROCKFALL MITIGATION  MEASURES AT SAPTSHRUNGI GAD, NASHIK
ROCKFALL MITIGATION MEASURES AT SAPTSHRUNGI GAD, NASHIK
The rockfall mitigation measures constituted of secured drapery system with Steelgrid MO and High Energy Absorption (HEA) panels and surface anchoringView
star
ROCKFALL MITIGATION WORKS- RAILWAY LINE-NEAR CH 14 – ANPARA
ROCKFALL MITIGATION WORKS- RAILWAY LINE-NEAR CH 14 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. RView
star
ROCKFALL PROTECTION AT SIMPANG PULAI, PERAK, MALAYSIA
ROCKFALL PROTECTION AT SIMPANG PULAI, PERAK, MALAYSIA
Based on the rockfall trajectory analysis, the design energy level required is 2000 kJ. Flexible barrier with post height of 4m in installed over 500mView
star
ROMBLON DEO TABLAS CIRCUMFERENTIAL ROAD
ROMBLON DEO TABLAS CIRCUMFERENTIAL ROAD
The road is the main thoroughfare of the Tablas Island. In order to protect the road and ensure serviceability after a typhoon, Maccaferri proposed thView
star
S209省道织金至绮陌(互通段)高大加筋土挡墙项目
S209省道织金至绮陌(互通段)高大加筋土挡墙项目
根据业主提出的要求,贵州省交通规划勘察设计研究院先后推荐了桩板墙支挡方案和加筋格宾挡墙支挡方案。 View
star
SADAWARNA DAM PARAMESH WALL
SADAWARNA DAM PARAMESH WALL
The Retaining Wall Structure for Stilling Basin in Sadawarna Dam is constructed using Paramesh System with a height of 5m, consisting of the TerrameshView
star
SAFETY WORKS ON THE RD 900 IN THE ROCHAILL SECTOR
SAFETY WORKS ON THE RD 900 IN THE ROCHAILL SECTOR
As part of the MBC project in the Alpes de Haute Provence department, EPC France called on France Maccaferri to provide a wide range of solutions for View
star
SEATION TRAMWAY
SEATION TRAMWAY
The site is situated above an area of soft soil that required  substantial ground improvement.The new platform area   adjacent to View
star
Second Stage MME at Puerto Escondido Airport
Second Stage MME at Puerto Escondido Airport
To strengthen the embankment, a longitudinal containment structure was designed and built, combining gabion walls and the Terramesh System along with View
star
SLOPE PROTECTION MEASURES- RAILWAY LINE- NEAR CH 13 – ANPARA
SLOPE PROTECTION MEASURES- RAILWAY LINE- NEAR CH 13 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. VView
star
SLOPE STABILISATION PORT OF ZIERBENA
SLOPE STABILISATION PORT OF ZIERBENA
To secure the area, a highly rigid flexible containment system was designed and installed to limit ground deformation as much as possible, with a veryView
star
SLOPE STABILIZATION AND PROTECTION AT ULU SLIM RIVER, PERAK
After careful considerations, Jabatan Kerja Raya (JKR) Batang Padang adopted Maccaferri Gabions Retaining Wall to solve this problem and increase safeView
star
Small green lung in the Metelliana Valley
Small green lung in the Metelliana Valley
Maccaferri’s solution to the environmental challenges posed by the abandoned landfill in Cava de’ Tirreni involved the application of advanced geoView
star
SMRITIVAN EARTHQUAKE MEMORIAL
SMRITIVAN EARTHQUAKE MEMORIAL
Maccaferri was involved in the supply, design and supervision of double twisted, mechanically woven gabions structures for the project. Gabions designView
star
SNCF LINE 930 000 FROM MARSEILLE TO VINTIMILLE
SNCF LINE 930 000 FROM MARSEILLE TO VINTIMILLE
The work involved installing 3 lines of protective screens on the rock faces located on the slope and in the access trench to the Cap Martin tunnel, fView
star
St Andrews Royal & Ancient Golf Club
St Andrews Royal & Ancient Golf Club
The approved scheme was designed by HR Wallingford, to include both ‘hard’ and ‘soft’ engineering solutions and the contract was supervised byView
star
SUNSET CLIFF
SUNSET CLIFF
The solution adopted for the Sunset Cliff walls consists of two types of systems:Gravity walls using gabions for walls with heights less than 6 metersView
star
TARLAC-NUEVA ECIJA PROVINCIAL ROAD
TARLAC-NUEVA ECIJA PROVINCIAL ROAD
In this, Maccaferri engineers designed an asphalt reinforcement system using MacGrid ARVG fiberglass geocomposite, which was primarily designed tView
star
TERRAMESH RD PATRIMONIAL
TERRAMESH RD PATRIMONIAL
The slope, characterized by its steep incline, created a challenging situation that required the implementation of containment measures to ensure the View
star
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
Firstly we redesigned the solution using Terramesh units with dimensions 3x3x1x1m. To ensure stability, Terramesh System was reinforced with ParaView
star
TERZO VALICO DEI GIOVI – GENOVA JUNCTION
TERZO VALICO DEI GIOVI – GENOVA JUNCTION
Maccaferri proposed an innovative approach involving Automated Tunnel Ribs HEB 300 complete with automated hinges and automated links (covering a lengView
star
The Ash Yard of the Thermal Power Plant
The Ash Yard of the Thermal Power Plant
The creation of cells was carried out, protected with geosynthetics both at their base and in the closure, with three levels of impermeable protectionView
star
THE GRAND BOHEMIAN HOTEL
THE GRAND BOHEMIAN HOTEL
Initially, the project specifications called for S8 Aluminum anchors to be driven to a depth of 16'. However, during the installation, numerous prView
star
THE NEW ROUTE DU LITTORAL
THE NEW ROUTE DU LITTORAL
The solution defined by the project management for the landward embankments was a geosynthetic stiffened embankment with a double-twist gabion facing.View
star
THREE CITIES TRAIL
THREE CITIES TRAIL
The civil engineers at Halff successfully designed and  implemented a tie-back reinforced gabion retaining wall to   act as the slView
star
TK 2018 – 006 – MRV
TK 2018 – 006 – MRV
The solution adopted for this construction case involves a rectangular channel with cross-sectional heights varying between 2 and 4 meters. Gabion BoxView
star
VOID SPANNING IN HOUSING DEVELOPMENT
VOID SPANNING IN HOUSING DEVELOPMENT
The Developer’s Engineer approached Maccaferri to providedesign and supply of a high-strength geogrid solution. The proposed site topography was comView
star
WALTHAM HIGH SCHOOL
WALTHAM HIGH SCHOOL
Based on the rock wall’s height, geotechnical characteristics and the proximity of it to the school, a pinned drapery solution was the recommended mView
star
万纬物流贵州空港物流园
万纬物流贵州空港物流园
垫层破损处挖除混凝土与碎石层,直接浇筑C15混凝土至垫层顶部。 View
star
中兰客专甘肃段主动防护网项目
中兰客专甘肃段主动防护网项目
经过现场踏勘,结合相关资料及综合考虑工程特点,设计院考虑对墩顶高程以上右侧山体自然坡面采用主动防护网View
star
乌鲁木齐市某反恐基地挡弹墙工程
乌鲁木齐市某反恐基地挡弹墙工程
加筋格宾柔性支挡方案的应用不仅解决了本工程亟待解决的难题,而且其特有的性能优势和良好的工程应用效果更View
star
乐联超市物流仓库
乐联超市物流仓库
马克菲尔公司技术团队根据该改造项目的情况,综合分析了厂区地坪沉降、改造厂区用途、设计荷载情况,推荐基View
star
云南:兰坪铅锌矿三重山排土场挡墙项目
云南:兰坪铅锌矿三重山排土场挡墙项目
解决方案 根据项目工程地质条件和工程要求,业主、设计单位综合考虑经济性及挡墙整体受力情况最终确定采View
star
京广线孝子店滑坡治理工程
京广线孝子店滑坡治理工程
根据工程实际,经多方案比较,格宾挡墙以其柔性、对不良地基变形的适应性、透水性、施工便捷性、适应一定水View
star
京杭运河宿迁段护岸工程
京杭运河宿迁段护岸工程
针对此情况,马克菲尔公司与建设单位苏北运河管理处密切配合,提出了格宾挡墙及雷诺护垫新型岸坡防护方案。 作View
star
京沪高速改扩建排水工程
京沪高速改扩建排水工程
公路扩建区尽量减少扰动原路基的基础上,让新老排水结构衔接顺畅,避免衔接处堵塞;挡墙后,在保证排水系统View
star
北京现代MOBIS汽车配件(BMP)有限公司地坪
北京现代MOBIS汽车配件(BMP)有限公司地坪
马克菲尔给出了独特解决方案,在未借助任何辅助设备情况,采用拌合站直接抛投散丝钢纤维进入混凝土。混合后View
star
北江航道扩能升级项目飞来峡枢纽二、三线船闸工程
北江航道扩能升级项目飞来峡枢纽二、三线船闸工程
结合业主对长环境和生态保护方面的考虑,马克菲尔公司提出了兼具抗冲刷性能、适应地基不均匀沉降以及具有良View
star
南澳东涌村排洪渠整治工程
南澳东涌村排洪渠整治工程
南澳水务管理中心为了根治东涌村时常遭水浸的难题,决定加高、扩宽村里的排洪渠。同时考虑到东涌村在旅游区View
star
卡特彼勒矿用机械公司工厂
卡特彼勒矿用机械公司工厂
选择了20Kg/m³的钢纤维对地坪混凝土进行增强。 View
star
咸阳子午轮胎厂区地坪工程
咸阳子午轮胎厂区地坪工程
马克菲尔中国公司在详细了解客户需求后,出具了更为合理的Wirand® FF1钢纤维混凝土地坪解决办法。受到了包括业View
star
嘉名针织二楼生产车间地面工程
嘉名针织二楼生产车间地面工程
钢纤维增强混凝土是将高强钢纤维与找平层混凝土均匀混合,形成的一种控裂效果极强的复合材料,可有效实现找View
star
四川岷江大件河道整治工程
四川岷江大件河道整治工程
通过对不同结构形式进行对比分析,经专家评审,设计院最终采用了具有环保、透水性强、抗冲性能强的赛克格宾View
star
四川李家沟矿区一号加筋格宾挡墙项目
四川李家沟矿区一号加筋格宾挡墙项目
解决方案 根据项目工程地质条件和工程要求,业主、设计单位综合考虑经济性及挡墙整体受力情况最终确定采View
star
四川飞龙路(象山路—遂乐路)市政道路工程
四川飞龙路(象山路—遂乐路)市政道路工程
在保证节省用地,不超用地红线的前提下,采用整体性高,对基础承载力要求相对较低的柔性加筋土结构,并能在View
star
天津南港工业区防波堤护面工程
天津南港工业区防波堤护面工程
设计单位就此问题, 曾提出两种解决方案: 1 .纯抛石护面方案: 抛填结构最大的特点就是柔性,对地基不均匀沉View
star
天津市东丽区袁家河永久调线工程
天津市东丽区袁家河永久调线工程
通过对不同结构形式进行对比分析,经专家评审,设计院最终采用了具有柔性生态防护性能的格宾与雷诺护垫结合View
star
天津市外环河完善工程
天津市外环河完善工程
由于传统方案的工程效果很不理想,业主想在收尾工程中找到一种替代方案来解决传统方案的“顽疾”。经过业主View
star
天津市蓟运河试验段工程
天津市蓟运河试验段工程
马克菲尔根据工程实际提出了23 cm厚镀高尔凡覆塑雷诺护垫护坡+格宾压脚的治理方案。作为蓟运河治理试验段工程View
star
天津市西青区程村排河治理工程
天津市西青区程村排河治理工程
马菲尔中国公司针对本工程的特点推荐生态格宾挡墙的支挡结构形式,此结构形式既能阻挡岸坡滑塌,提高了岸坡View
star
好邻居超市物流库房
好邻居超市物流库房
结合项目基础、荷载情况以及工程预算方面综合考虑,马克菲尔与合作方向业主方推荐Flexmesh软基垫加筋基础+钢纤View
star
好邻居超市物流库房软基础加筋工程
好邻居超市物流库房软基础加筋工程
马克菲尔与合作方向业主方推荐Flexmesh软基垫加筋基础+钢纤维混凝土地坪组合方案,同时加固地坪基础层与结构受View
star
嵩县伊河生态治理工程
嵩县伊河生态治理工程
河堤边坡设计0.3m厚雷诺护垫后覆土绿化,坡脚设C20砼齿墙齿墙外设两层0.3m雷诺垫护脚。 工程总结: 嵩县伊河生态View
star
常张高速公路K129右侧弃土场挡墙  
常张高速公路K129右侧弃土场挡墙  
在新的方案设计时,经多方案比选后,最终选定兼具柔性与透水性的马克菲尔格宾挡墙结构。设计方案为:格宾挡View
star
常德柳叶湖(沾天湖)综合治理工程
常德柳叶湖(沾天湖)综合治理工程
雷诺护垫在应用于水下抗冲结构时,能起到很好抗冲固土的作用。同时,此次采用的30m厚镀高尔凡雷诺护垫不仅满View
star
常德烟草机械公司厂区扩建工程
常德烟草机械公司厂区扩建工程
该方案主要针对烟机厂地坪的特点,本着安全、可靠、快速、经济的原则,结合工程实际情况采用FF3型号钢纤维方View
star
常德烟草机械厂车间技改工程
常德烟草机械厂车间技改工程
该方案主要针对烟机厂地坪的特点,本着安全、可靠、快速、经济的原则,结合工程实际情况采用FF3型号钢纤维方View
star
平顶山湛河生态治理工程
平顶山湛河生态治理工程
对于该工程防护结构的具体要求,经过综合对比之后,最终采用了格宾及雷诺护垫的柔性防护方案。针对不同的区View
star
广东乌涌综合整治工程
广东乌涌综合整治工程
为了解决漫岸问题,需开挖河道,同时对下部采用支挡方式增加过水面积,由于河道淤泥层过厚,考虑格宾和雷诺View
star
广西G75兰海高速K1711路段危岩防治工程
广西G75兰海高速K1711路段危岩防治工程
通过对地形地貌、地层岩性、地质构造及地震动参数、病害隐患区调查及分析,明确了该路段的落石病因及潜在的View
star
广西贵隆高速加筋格宾挡墙工程
广西贵隆高速加筋格宾挡墙工程
在充分考虑工程存在的承载力低,占地空间受限,挡墙邻水浸泡等问题后,在保证安全的前提下,经过多方专家论View
star
张南高速加筋格宾挡墙工程
采用双级路堤式加筋格宾挡墙进行支挡,节省占地,多孔隙结构有利于排水,保证结构稳定,就近利用当地资源,View
star
新建川藏铁路施工道路落石防护工程
新建川藏铁路施工道路落石防护工程
针对该项目施工道路沿线落石灾害问题,马克菲尔中国公司经过现场踏勘,综合考虑工程特点及难点,并结合相关View
star
昆山市生态河道整治工程
昆山市生态河道整治工程
经过多种方案论证比较,建设方最终选择马克菲尔提供的柔性、生态性、景观性、透水性、耐久性能好的格宾挡墙View
star
昆明市海河截污及水环境治理工程
昆明市海河截污及水环境治理工程
考虑到海河的淤泥质地基,以及市政河道对景观生态的要求等,业主和设计单位确定采用马克菲尔格宾与雷诺护垫View
star
易商(武汉)物流园工程
易商(武汉)物流园工程
作为新兴电子商务运营商,上海易商电子商务运营中心对该物流园建设非常重视,着力发挥高效、质优、快速的特View
star
杭州机场轨道快线工程
杭州机场轨道快线工程
在正式施工前,往往需要经过两个步骤:首先在搅拌站进行配合比小机试验,确定满足要求的配比;然后再进View
star
梅龙高铁弃渣场格宾挡墙项目
梅龙高铁弃渣场格宾挡墙项目
马克菲尔中国公司综合考虑工程特点及环水保要求等方面,向设计院推荐了格宾生态挡墙的技术方案。格宾是View
star
武宣大藤峡库区防护工程项目
武宣大藤峡库区防护工程项目
针对该项目,客户通过多方案比选,选择了马克菲尔生态性能好、施工便捷及抗冲性能优越的雷诺护垫结构。View
star
武广高铁赤壁车站挡墙
武广高铁赤壁车站挡墙
业主组织专家对不同结构形式进行了对比分析,专家对马克菲尔公司推荐的格宾挡墙结构形式予以了充分的肯定。View
star
武汉市江北快速通道景观绿化工程
武汉市江北快速通道景观绿化工程
该方案先对原状边坡进行清表后,依次喷射土壤增活有机基质、高性能生态基材 (加种子),表面铺设素克垫并进行View
star
江西省景德镇市泰豪珑边坡复绿工程
江西省景德镇市泰豪珑边坡复绿工程
采用了“锚杆+STG高强加筋网+土层喷附+高性能生态基材喷播”的方案。View
star
河北省长城汽车工业园区地坪工程
河北省长城汽车工业园区地坪工程
为有效解决工程实际困难,马克菲尔中国公司为客户量身定制了解决方案。根据厂区地坪基础处理情况、上部荷载View
star
河南盘溪河治理工程
河南盘溪河治理工程
该河道为季节性河流,合股较浅,洪水期流速大。该河道岸坡放坡空间小,综合考虑防洪和生态要求,采用格宾挡View
star
洞庭湖整治项目沅江草尾河段护岸工程
洞庭湖整治项目沅江草尾河段护岸工程
马克菲尔雷诺护垫作为一种柔性与整体性俱佳的护砌结构具有良好的护坡与防冲性能,其在欧美等国已成为堤防工View
star
浙江杭绍台高速古来互通格宾挡墙工程
浙江杭绍台高速古来互通格宾挡墙工程
格宾挡墙系统采用镀高尔凡双绞合六边形金属网作为面墙,内部填充石料,石料直接来源于高速旁边的采石场,隧View
star
浙江省衢州市开化道路工程
浙江省衢州市开化道路工程
解决方案:马克菲尔中国公司引进了目前欧美最新的类似情况解决技术后,推出了路面加筋网技术来解决此问题。View
star
浙江绍兴至诸暨高速隧道口格宾挡墙工程
浙江绍兴至诸暨高速隧道口格宾挡墙工程
格宾挡墙系统采用镀高尔凡双绞合六边形金属网作为面墙,内部填充石料,石料直接来源于高速旁边的鹅卵石,隧View
star
浙江绍诸高速绿色加筋格宾
浙江绍诸高速绿色加筋格宾
绿色加筋格宾系统采用镀锌覆塑双绞合六边形金属网作为筋材,其抗拉强度等于50kN/m。绿色加筋格宾是由钢丝网面View
star
浙江绍诸高速绿色加筋格宾挡墙工程
浙江绍诸高速绿色加筋格宾挡墙工程
设计坡高为9.88m,竖向间距为0.76m,筋材长度7m,采用满铺式,共计13层,设计断面如图1所示。考虑道路车辆荷载10kView
star
浙江:常山县辉埠至何家公路复合加筋格宾挡墙项目
浙江:常山县辉埠至何家公路复合加筋格宾挡墙项目
解决方案 在保证边坡绿化效果的同时,尽量减少建设用地,并减少因地基承载力需求产生的基础处理成本。 方案View
star
深茂快速铁路边坡绿化项目
深茂快速铁路边坡绿化项目
基于以上问题,由施工方提出变更需求,中国中铁第四勘察设计院核实情况后向马克菲尔中国公司进行咨询,经过View
star
湖北大广北高速兰溪互通加筋土路基支挡工程
湖北大广北高速兰溪互通加筋土路基支挡工程
针对此问题,马克菲尔(中国)公司和设计单位在多方案比选后,决定采用马克菲尔的加筋格宾方案。该方案具有View
star
湖北省武汉市府河花田花海复绿工程
湖北省武汉市府河花田花海复绿工程
1 场地征用:花田花海用地处于府河两岸河滩及河床中间裸漏的环形岛,每年府河水位一旦下降,周围村民会抢先View
star
湖北省武汉市长江主轴左岸复绿工程
湖北省武汉市长江主轴左岸复绿工程
在六方块植草砖护坡的裸露边坡上,采用进口土壤增活有机基质喷播野花组合和高羊茅翠波,完成后采用洒水车养View
star
湖北省神龙架机场复合加筋格宾挡墙
湖北省神龙架机场复合加筋格宾挡墙
凭借马克菲尔集团在处理超高填方工程方面的丰富经验,同时借鉴国内外类似的超高填方工程案例,最终采用了高View
star
湖南创远“湘江壹号”别墅区
湖南创远“湘江壹号”别墅区
设计方长沙有色冶金设计院总图所采用加筋格宾与绿色加筋格宾结构修筑该加筋坡体,对于基础下部填方要求按照View
star
湖南常德至吉首高速公路10标格宾挡墙
湖南常德至吉首高速公路10标格宾挡墙
经过多方考察和论证,建设方最终确定选择马克菲尔整体性能好、柔性好、透水性好、生态性好的的新型支挡结构View
star
湖南省取消高速公路省界收费站工程
湖南省取消高速公路省界收费站工程
经过现场路面检测及专家论证,该段混凝土路面破损较少,基层顶面回弹模量高,结构整体稳定性较好,建议保留View
star
湖南省娄新高速公路
湖南省娄新高速公路
马克菲尔中国公司引进了目前欧美最新的类似情况解决技术后,推出了路面加筋网技术来解决此问题。该项技术将View
star
湖南省宁乡市格力再生资源永久性边坡支护工程
湖南省宁乡市格力再生资源永久性边坡支护工程
格宾挡墙结合坡体加筋进行支挡,坡面采用加筋麦克垫结合喷播生态基材进行覆绿。格宾挡墙采用外台阶形式,面View
star
湖南省永州大道
湖南省永州大道
马克菲尔中国公司引进了目前欧美最新的类似情况解决技术后,推出了路面加筋网技术来解决此问题。该项技术将View
star
湖南:安化紫薇中学加筋格宾挡墙项目
湖南:安化紫薇中学加筋格宾挡墙项目
解决方案 根据项目工程地质条件和工程要求,业主、设计单位综合考虑技术安全性、经济性、生态性及加筋格View
star
湘江长沙综合枢纽蔡家洲护岸工程
湘江长沙综合枢纽蔡家洲护岸工程
根据工程实际情况,综合考虑防冲刷性、环境亲和性和经济性等,采用加筋麦克垫、雷诺护垫和格宾垫对边坡进行View
star
潮州供水枢纽抢险加固海漫工程
潮州供水枢纽抢险加固海漫工程
由于格宾垫和雷诺护垫在石料填充饱满的情况下有30%的空隙率,具有明显的消能效果;同时,单个护垫通过绞合钢View
star
盒马鲜生物流仓储项目
盒马鲜生物流仓储项目
解决方案 鉴于项目轻型荷载(2吨/㎡)与控制温差收缩的目标,马克菲尔技术团队给出了基于以下做法的地面解决View
star
福建连江S308替代绕行段沥青路面大修工程
福建连江S308替代绕行段沥青路面大修工程
考虑路面基层和面层都已出现较宽裂缝,且存在变形问题,因此建议处理措施为采用打孔注浆的方法加固基层,解View
star
西汉长沙王后“渔阳”墓落石防护工程
西汉长沙王后“渔阳”墓落石防护工程
崩落取到稳固作用,六边形双绞合网面对表面小石块的崩落取到约束作用,或约束在坡面上,或者缓慢顺着坡面下View
star
贵州剑河清水江生态护岸工程
贵州剑河清水江生态护岸工程
尽量保持原河势流态,使堤防平缓连接,结合河道自然地形,宜宽则宽,宜弯则弯,并与大洪水的主流线大致平行View
star
赣州垃圾焚烧发电厂边坡治理工程
赣州垃圾焚烧发电厂边坡治理工程
本项目的治理工程为加筋格宾挡墙工程,加筋拦砂坝工程,放坡绿化工程以及排水沟工程。其中加筋格宾挡墙和加View
star
连江西牛航电枢纽护坡护底工程
连江西牛航电枢纽护坡护底工程
该工程包括护坡及护底在内共需铺设120,000平方米的雷诺护垫,岸坡平均铺设长度超过16米,同时还根据最大淘刷深View
star
郴州市九子塘路道路边坡治理工程
郴州市九子塘路道路边坡治理工程
对不稳定边坡采用锚杆深层加固,表层采用生态基材喷播并覆盖加筋麦克垫来恢复植被及坡面防护。View
star
都匀市七星棚户改造项目安置房北西侧边坡治理工程
都匀市七星棚户改造项目安置房北西侧边坡治理工程
方案包括四个主要构成部分,自坡面向上依次为喷附土层、麦克垫、土壤增活有机基质和高性能生态基材,其中麦View
star
长城汽车(徐水)零部件工厂二期工程
长城汽车(徐水)零部件工厂二期工程
为有效解决工程实际困难,马克菲尔中国公司为客户量身定制了解决方案。根据厂区地坪基础处理情况、上部荷载View
star
长江中游戴家洲河段航道整治二期工程
长江中游戴家洲河段航道整治二期工程
根据工程实际情况,马克菲尔首先推出植生型雷诺护垫这一新材料、新技术和新工艺,同时考虑加筋麦克垫和雷诺View
star
陕西省铜川市薛家寨红军洞落石防护工程
陕西省铜川市薛家寨红军洞落石防护工程
通过现场实地考察,现场边坡节理、裂隙发育,考虑到强风化岩层本身潜在的不稳定性,我们向业主推荐了主动防View
star
陕西:冀东水泥铜川有限公司惠塬工业园边坡防护绿化工程
陕西:冀东水泥铜川有限公司惠塬工业园边坡防护绿化工程
优化方案:采用马克菲尔公司的BIOS系统(钢筋锚杆+加筋麦克垫,结合基质/基材喷播) (1)BIOS系统:钢筋View
star
青白江绣川河综合整治工程
青白江绣川河综合整治工程
原设计方案为C20混凝土护岸,经过多方案必选,采用马克菲尔雷诺护垫生态护岸,即利于植被生长,同时充分利用View
star
首钢集团冷轧板工厂
首钢集团冷轧板工厂
我司技术部门根据钢材行业荷载特点,优先向首钢集团推荐了Wirand FF1纤维解决方案。设计采用20Kg/m³钢纤维对200板View
star
马克菲尔中国生产基地工程
马克菲尔中国生产基地工程
根据现场实际与工程地质条件,决定采用格宾挡墙作为支挡的方案。挡墙的实际长度为48m,在东侧接9m 长的招牌墙View
star

您没找到想到的信息吗?

筛选
高级检索












咨询专业团队

我们在民用和工业建筑领域是成功的合作伙伴,产品范围广泛,可满足该行业的各种技术需求:包括结构排水、水资源保护、结构防水等应用,满足环保节能并保障舒适性,也可解决蒸汽控制以及相关问题。

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.